How can we schedule Polled Data report ?
- Navigate to Settings → Schedule Reports → New Schedule.
- Select Attribute as the Report Type.
- Choose Polled Data as the Report Period.
- In the Select Attribute dropdown, select the required metrics.
- Under Select Resources, choose the required monitor types.
- Configure the Recurrence Details and Report Delivery settings as needed.
- Click Save to create and schedule the report.
- The scheduled report will be generated and delivered with the polled data.
Note
In the Enterprise Edition, Polled Data report period is not available for the Attribute report type when scheduling reports from the Central Server.
New to ADSelfService Plus?