How to change FAVICON in the application ?

How to change FAVICON in the application ?

In order to change the FAVICON (displayed below) please follow the instructions given below.



For the builds above 9400  Place your icon under the location [Product_Home] \ServiceDeskPlus-Msp\webapps\ROOT\images, and replace the favicon image.

2) Once the file is placed in the above directory, stop and start the application service once and check after clearing cache and cookies.

Note: Extension of the file name should be .ico, size should be 16 x 16.

                  New to ADManager Plus?

                    New to ADSelfService Plus?

                      • Related Articles

                      • Login Page Customization -> SAML Login

                        NOTE: # No need to alter the changes in the application UI # Ensure to take a copy/backup of the below files before altering the same. STEPS TO FOLLOW: 1. Edit the file Login.html under <Drive>:\ManageEngine\ServiceDeskPlus-MSP\Server\Custom\Login ...
                      • How to change application port

                        1. Stop the application  2. Open Command Prompt as Admin 3. Go to ManageEngine\ServiceDeskPlus-MSP\bin 4. Invoke command changeWebServerPort.bat [newportnumber] [Protocol http or https] 5. Start the application. Refer below screenshot  Note : ...
                      • Change icons for the buttons in SSP

                        To change the default icons for the buttons available under SSP, To change the Triangle icon for I am facing an issue, and similarly for the other two options, login to the application as an administrator, goto Admin- Self service portal settings, ...
                      • Risk Matrix for Change using Custom Module

                        PURPOSE: Creating Risk matrix for changes that automatically calculates the risk of a change based on its priority and impact. Similar to the Priority matrix in the request module. TESTED IN BUILDS: 14504 STEPS: Step 1: Configure the Custom Module: ...
                      • Automating change stage transition based on task completion

                        PURPOSE: To automatically move to the next change stage when all tasks are closed, using task custom function and task custom trigger. The attached script triggers upon the closure of each task, verifying whether all tasks within the current stage ...