Hi,
On manager server, one of managed servers synchronizing takes too long time, more than five minutes, in both less monitor added this managed server only 40 monitors. other two managed servers have more monitors and synchronizing in few seconds,
managed servers Load factor is 0.0, managed servers on same network, SQL DBs on same server, managed servers cpu&memory usage levels normal,
thanks..