Hi,
I have a load of scheduled jobs to send out reports on the on one of our SDP instances and I have jobs set to run every 5 minutes and 2 jobs scheduled for every 5 minutes slot.
What I'm seeing is the following on a random sporadic basis -
Report 1 for user 1 set to run at 10:00
Report 2 for user 2 set to run at 10:00
User 1 gets report and the email is her email, but the attached report is for user 2.
It's like it is running both reports at the same time and then getting confused with who it is attaching the report for.
Is this something that anyone else has experienced? I have over 60 reports queued up, running 2 every five minutes. If I have to space it out to run one every five minutes that's a really long process.