Hi,
Wondered if the following is at all possible.
If an organisation has two CAB processes but one central helpdesk is it possible to have two "Change" tabs pointing to two different change lists. So the Tabs in the taskbar are totally independent of each other and each with its own Change ID numbering system?
Both would require its own templates for details captured especially for the submission stage and also create two templates for the planning area.
If this is possible, then what is required to be able to set this up?
Many thanks in advance.