The new worklog behavior has a lot of potential.
The 81xx build behavior would populate the Executed Time with the current date/time if none was submitted.
The 8200 build now populates a createdtime field that isn't visible in the UI by default.
I have a few issues with this
1- The change now breaks existing reports that rely on the time field. If I don't manually enter something in starttime, then the data won't show up on the reports. createdtime is not always the same as starttime.
2- Is there a way to report all worklogs on 1 report (tasks, change, incident)?
3- Description in worklog list. I don't see the option to add this to the list view. This was a default field before.