I have 200 closed changes and I need to add 1 piece of data, specifically, a date.
How can I do it?
I tried the IMPORT WIZARD for Change.
Using a dummy ID (CHG-100) and the changes sample CSV file. Trying to modify only the title on this particular change I got this error:
(BTW: The field "status" is not empty)
Attached is the CSV file that I'm using for this test.