I'm using the M365 Manager Plus (version 4.4 Build 4414, 64 bit)
The Product schedulers working fine but for the specific Reports (Report Name) in the schedulers which encounter a failure, there is:
-No reason specified about the cause of failure/incomplete execution -No option provided by ManageEngine to execute only the failed reports.
The entire Scheduler is required to be re-executed which can take several hours in a huge MS365 environment and results in the same failures as the previous results.. ManageEngine needs to make available the option to execute that specific report which ran into a failure without having to rerun the entire scheduler